COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-069-06305                               Status: PA         3/31/2017
Well Name/No: MSSU #30-15 (click well name for production)
Operator: PROSPECT ENERGY LLC - 10312
Status Date: 3/31/2017 Federal or State Lease #:
FacilityID: 217118 LocationID: 333082
County: LARIMER #069 Location: NWSE  30 8N68W 6 PM
Field: FORT COLLINS  - #25100 Elevation: 5,080 ft.
Planned Location       1516 FSL  1360 FEL Lat/Long: 40.629005/-105.043694 Lat/Long Source: Field Measured
As Drilled Location      Footages Not Available Lat/Long: 40.629005/-105.043694 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         4/8/2011
Job End Date:  4/8/2011
Reported:   Prior to rule 205A.b.(2)(A)  
Wellbore Data for Sidetrack #00                                                    Status: PA         3/31/2017
Spud Date: 7/14/1991 Spud Date is: ACTUAL
Wellbore Permit   DIRECTIONAL
Permit #: Expiration Date: 3/21/2013 5:20:17 PM
Prop Depth/Form: 5100 Surface Mineral Owner Same: N
Mineral Owner: FEE Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: CODL , Formation: CODELL , Order: STATEWIDE , Unit Acreage: , Drill Unit:
Formation and Spacing: Code: MDDYJ , Formation: MUDDY J , Order: 84-2 , Unit Acreage: 0, Drill Unit:
Formation and Spacing: Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing: String Type: SURF , Hole Size: 13.25, Size: 9.625, Top: 0, Depth: 455, Weight: 36
Cement: Sacks: 320, Top: 0, Bottom: 455, Method Grade:
Casing: String Type: 1ST , Hole Size: 8.75, Size: 5.5, Top: 0, Depth: 5096, Weight: 15.5
Cement: Sacks: 360, Top: 3614, Bottom: 5096, Method Grade:
Wellbore Completed
Completion Date: 8/26/1991
Measured TD: 5100 Measured PB depth: 5068
True Vertical TD: 4996 True Vertical PB depth: 4965
Top PZ Location:           Sec: 30 Twp: 8N 68W Footage: 1573 FSL  1046 FEL Depth
Bottom Hole Location:   Sec: 30 Twp: 8N 68W Footages: 1627 FSL  772 FEL Depth
Log Types: Cement bond logs submitted as a pdf file. A paper copy was not available to send.
Log Types: DIL, GR, DENSITY, NEUTRON
Casing: String Type: SURF , Hole Size: 12.25, Size: 9.625, Top: 0, Depth: 455, Weight: 36
Cement: Sacks: 455, Top: 0, Bottom: 284, Method Grade: VISU
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 5096, Weight: 15.5
Cement: Sacks: 360, Top: 3614, Bottom: 5096, Method Grade: CBL
Additional Cement: String Type: S.C. 1.1 , Top: 255, Depth: 720, Bottom: 720, Sacks: 120, Method Grade: 1 INCH
Additional Cement: String Type: S.C. 1.2 , Top: 1000, Depth: 1630, Bottom: 1630, Sacks: 180, Method Grade: 1 INCH
Formation Log Top Log Bottom Cored DSTs
SHANNON 1399
NIOBRARA 4087
CODELL 4429
BENTONITE 4746
MUDDY J 5000
Completed information for formation MDDYJ                                     Status: AB         11/17/2016
1st Production Date: N/A Choke Size:
Status Date: 11/17/2016 Open Hole Completion:
Commingled: Production Method:
Formation Name: MUDDY J Status: AB
Formation Treatment
Treatment Date: 10/26/2011    
Treatment summary: Wireline service ran CBL from 3800' to 200' showing cement presence from 1650' to 1300', not showing up on upper interval from 700' to 250'. Set CIBP at 4900'.
Formation Treatment
Treatment Date: 5/29/2002    
Treatment summary: 2,000 GAL 1% HCL W/BALL SEALERS, 309,000# 16/30 SAND IN CROSSLINKED WATER BASED GEL
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: N/A Test Method:
Hours Tested: Gas Type:
Gas Disposal:
Test Type Measure
    BBLS_H2O 3.5    
    BBLS_OIL 1.72    
    CALC_BBLS_H2O 157.3    
    CALC_BBLS_OIL 77.6    
    CASING_PRESS 12    
    GRAVITY_OIL 36    
    Perforation Data:
    Interval Bottom: 5054 Interval Top: 5004
    # of Holes: 50 Hole Size: 7.875
Completed information for formation NBRR                                     Status: AB         3/31/2017
1st Production Date: 4/8/2011 Choke Size:
Status Date: 3/31/2017 Open Hole Completion: N
Commingled: N Production Method:
Formation Name: NIOBRARA Status: AB
Formation Treatment
Treatment Date: 4/8/2011    
Treatment summary: Perforation intervals: 4,164'-4,178' (42 holes); 4,200'-4,208' (24 holes); 4,236'-4,242' (18 holes). Pumped 143 bbls 15% HCI, 54 bbl Linear Gel, 3114 bbls of 20 lb Xlink Gel, Proppant- 250,879 lbs 20/40 White Sand. Pumped 142 bbls 16/30 Texas GOld sand. 3,311 bbls to recover.
Tubing Size: 2.875 Tubing Setting Depth: 4339
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 4/24/2011 Test Method: Pumping
Hours Tested: 24 Gas Type:
Gas Disposal: FLARED
Test Type Measure
    BBLS_H2O 64    
    BBLS_OIL 5    
    BTU_GAS 1100    
    CALC_BBLS_H2O 64    
    CALC_BBLS_OIL 5    
    CALC_GOR 1200    
    CALC_MCF_GAS 6    
    CASING_PRESS 10    
    GRAVITY_OIL 35    
    MCF_GAS 6    
    TUBING_PRESS 40    
    Perforation Data:
    Interval Bottom: 4240 Interval Top: 4164
    # of Holes: 90 Hole Size: 0.42