COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-067-07491                               Status: PR         9/4/2009
Well Name/No: SOUTHERN UTE #5-6 (click well name for production)
Operator: ENDURING RESOURCES LLC - 10663
Status Date: 9/4/2009 Federal or State Lease #: 14-20-604-6
FacilityID: 215886 LocationID: 326112
County: LA PLATA #067 Location: NWSE  5 33N10W N PM
Field: IGNACIO BLANCO  - #38300 Elevation: 6,682 ft.
Planned Location       1815 FSL  1670 FEL Lat/Long: 37.130897/-107.954311 Lat/Long Calculated From Footages
As Drilled Location      Footages Not Available Lat/Long: 37.13062/-107.954515 Lat/Long Source: Field Measured
Wellbore Data for Sidetrack #00                                                    Status: PR         9/4/2009
Spud Date: 5/8/1980 Spud Date is: ACTUAL
Wellbore Permit  
Permit #: 19900403 Expiration Date: 8/22/1990
Prop Depth/Form: 3225 Surface Mineral Owner Same: Y
Mineral Owner: INDIAN Surface Owner: INDIAN
Unit: Unit Number:
Formation and Spacing: Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-61 , Unit Acreage: 320, Drill Unit: S2
Wellbore Completed
Completion Date: 5/14/1990
Measured TD: 3214 Measured PB depth: 3174
True Vertical TD: True Vertical PB depth:
Log Types:
Log Types: GR,SP,DIL,CNL-FDC/HRL,CALIPER,MLT,CBL
Casing: String Type: SURF , Hole Size: 12.25, Size: 5.625, Top: 0, Depth: 334, Weight:
Cement: Sacks: 220, Top: 0, Bottom: 334, Method Grade:
Casing: String Type: 1ST , Hole Size: 7.875, Size: 5.5, Top: 0, Depth: 3214, Weight:
Cement: Sacks: 575, Top: 0, Bottom: 3214, Method Grade:
Formation Log Top Log Bottom Cored DSTs
FRUITLAND COAL 2608
FRUITLAND 2802 3014
PICTURED CLIFFS 3041
LEWIS 3200
Completed information for formation FRLD                                     Status: CM         9/4/2009
1st Production Date: 7/1/1996 Choke Size:
Status Date: 9/4/2009 Open Hole Completion:
Commingled: Production Method:
Formation Name: FRUITLAND Status: CM
Formation Treatment
Treatment Date: 8/28/2009    
Treatment summary: PULLED TUBING, CLEANOUT, RAN LINERF & PERFORATED.
Tubing Size: 2.375 Tubing Setting Depth: 2934
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
    Initial Test Data:
Test Date: 9/4/2009 Test Method: flowing
Hours Tested: 24 Gas Type:
Gas Disposal: SOLD
Test Type Measure
    BTU_GAS 937    
    MCF_GAS 173    
    Perforation Data:
    Interval Bottom: 3014 Interval Top: 2802
    # of Holes: 336 Hole Size:
Completed information for formation FRLDC                                     Status: PR         2/13/1997
1st Production Date: 7/1/1996 Choke Size:
Status Date: 2/13/1997 Open Hole Completion:
Commingled: Production Method: FLOWING
Formation Name: FRUITLAND COAL Status: PR
Formation Treatment
Treatment Date: 5/14/1990    
Treatment summary: SEE SCANNED DOCUMENT 00540443 AND 00540465
Tubing Size: 2.875 Tubing Setting Depth: 2783
Tubing Packer Depth: 2754 Tubing Multiple Packer:
Open Hole Top: 2830 Open Hole Bottom: 3020
    Initial Test Data:
Test Date: 2/13/1997 Test Method: FLOWING
Hours Tested: 24 Gas Type: COAL GAS
Gas Disposal: SOLD
Test Type Measure
    BBLS_H2O 165    
    CASING_PRESS 60    
    MCF_GAS 328    
    TUBING_PRESS 110    
    Perforation Data:
    Interval Bottom: 3020 Interval Top: 2830
    # of Holes: Hole Size: