COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-045-23928                               Status: DG         7/12/2019
Well Name/No: CC Federal #0697-03-03W (click well name for production)
Operator: LARAMIE ENERGY LLC - 10433
Status Date: 7/12/2019 Federal or State Lease #: COC 056830
FacilityID: 454724 LocationID: 335902
County: GARFIELD #045 Location: Lot 12 4 6S97W 6 PM
Field: GRAND VALLEY  - #31290 Elevation: 8,624 ft.
Planned Location       1888 FNL  915 FEL Lat/Long: 39.55764/-108.218728 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         9/24/2019
Job End Date:  10/8/2019
Reported:   10/15/2019
 
Days to report:  7
 
Wellbore Data for Sidetrack #00                                                    Status: DG         7/12/2019
Spud Date: 7/12/2019 Spud Date is: NOTICE
Wellbore Permit   DIRECTIONAL
Permit #: Expiration Date: 4/10/2020 11:40:23 AM
Prop Depth/Form: 10382 Surface Mineral Owner Same:
Mineral Owner: FEDERAL Surface Owner: FEE
Unit: Unit Number:
Formation and Spacing: Code: ILES , Formation: ILES , Order: 510-70 , Unit Acreage: 871, Drill Unit: Sec 3 All
Formation and Spacing: Code: WMFK , Formation: WILLIAMS FORK , Order: 510-70 , Unit Acreage: 871, Drill Unit: Sec 3 All
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 18, Top: 0, Depth: 80, Weight: 47.44
Cement: Sacks: 100, Top: 0, Bottom: 80, Method Grade:
Casing: String Type: SURF , Hole Size: 14.5, Size: 9.625, Top: 0, Depth: 2530, Weight: 36
Cement: Sacks: 1237, Top: 0, Bottom: 2530, Method Grade:
Casing: String Type: 1ST , Hole Size: 8.75, Size: 4.5, Top: 0, Depth: 10379, Weight: 11.6
Cement: Sacks: 1609, Top: 2030, Bottom: 10379, Method Grade:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 3 Twp: 6S 97W Footage: 576 N  1323 W Depth
Bottom Hole Location:   Sec: 3 Twp: 6S 97W Footages: 576 FNL  1323 FWL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: WO         9/26/2019
1st Production Date: 7/1/2019 Choke Size:
Status Date: 9/26/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: WO
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .