COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-045-22643                               Status: PR         9/1/2018
Well Name/No: Federal GM #513-11 (click well name for production)
Operator: TEP ROCKY MOUNTAIN LLC - 96850
Status Date: 9/1/2018 Federal or State Lease #: COC27874
FacilityID: 439915 LocationID: 323872
County: GARFIELD #045 Location: NESW  11 7S96W 6 PM
Field: GRAND VALLEY  - #31290 Elevation: 5,792 ft.
Planned Location       2025 FSL  2244 FWL Lat/Long: 39.450282/-108.078715 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         7/18/2018
Job End Date:  7/26/2018
Reported:   8/21/2018
 
Days to report:  26
 
Wellbore Data for Sidetrack #00                                                    Status: PR         9/1/2018
Spud Date: 6/17/2018 Spud Date is: NOTICE
Wellbore Permit   DIRECTIONAL
Permit #: Expiration Date: 1/8/2019 8:50:25 PM
Prop Depth/Form: 6761 Surface Mineral Owner Same:
Mineral Owner: FEDERAL Surface Owner: FEDERAL
Unit: Unit Number:
Formation and Spacing: Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing: String Type: CONDUCTOR , Hole Size: 26, Size: 18, Top: 0, Depth: 60, Weight: 48
Cement: Sacks: 25, Top: 0, Bottom: 60, Method Grade:
Casing: String Type: SURF , Hole Size: 13.5, Size: 9.625, Top: 0, Depth: 1000, Weight: 32.3
Cement: Sacks: 266, Top: 0, Bottom: 1000, Method Grade:
Casing: String Type: 1ST , Hole Size: 8.75, Size: 4.5, Top: 0, Depth: 6711, Weight: 11.6
Cement: Sacks: 865, Top: 3694, Bottom: 6741, Method Grade:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 11 Twp: 7S 96W Footage: 1613 FSL  1091 FWL Depth
Bottom Hole Location:   Sec: 11 Twp: 7S 96W Footages: 1613 FSL  1091 FWL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: PR         9/1/2018
1st Production Date: 5/1/2018 Choke Size:
Status Date: 9/1/2018 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .