COGIS - WELL Information

Scout Card             
 Related    Insp.
 MIT
GIS Doc   COA   Wellbore  Expanded OrdersOrders
Surface Location Data for API # 05-045-21088                               Status: PR         5/1/2019
Well Name/No: NPR #22B-10-596 (click well name for production)
Operator: CAERUS PICEANCE LLC - 10456
Status Date: 5/1/2019 Federal or State Lease #:
FacilityID: 425830 LocationID: 425805
County: GARFIELD #045 Location: SENE  15 5S96W 6 PM
Field: GRAND VALLEY  - #31290 Elevation: 6,428 ft.
Planned Location       2072 FNL  189 FEL Lat/Long: 39.616647/-108.14675 Lat/Long Source: Field Measured

Chemical Disclosure Registry
Job Date:         3/10/2019
Job End Date:  3/15/2019
Reported:   7/29/2019
 
Days to report:  136
 
Wellbore Data for Sidetrack #00                                                    Status: PR         5/1/2019
Spud Date: 7/22/2018 Spud Date is: NOTICE
Wellbore Permit   DIRECTIONAL
Permit #: Expiration Date: 7/1/2020 9:30:17 AM
Prop Depth/Form: 10387 Surface Mineral Owner Same:
Mineral Owner: FEE Surface Owner: FEDERAL
Unit: Unit Number:
Formation and Spacing: Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing: String Type: CONDUCTOR , Hole Size: 30, Size: 20, Top: 0, Depth: 100, Weight: 54#
Cement: Sacks: 218, Top: 0, Bottom: 100, Method Grade:
Casing: String Type: SURF , Hole Size: 14.75, Size: 9.625, Top: 0, Depth: 2500, Weight: 36#
Cement: Sacks: 994, Top: 0, Bottom: 2500, Method Grade:
Casing: String Type: 1ST , Hole Size: 8.75, Size: 4.5, Top: 0, Depth: 10029, Weight: 11.6#
Cement: Sacks: 1282, Top: 2804, Bottom: 10029, Method Grade:
Wellbore Completed
Completion Date: N/A
Measured TD: Measured PB depth:
True Vertical TD: True Vertical PB depth:
Top PZ Location:           Sec: 10 Twp: 5S 96W Footage: 625 S  1222 E Depth
Bottom Hole Location:   Sec: 10 Twp: 5S 96W Footages: 595 FSL  1306 FEL Depth
Formation Log Top Log Bottom Cored DSTs
Completed information for formation N-COM                                     Status: PR         5/1/2019
1st Production Date: 9/1/2018 Choke Size:
Status Date: 5/1/2019 Open Hole Completion:
Commingled: Production Method:
Formation Name: NOT COMPLETED Status: PR
Tubing Size: Tubing Setting Depth:
Tubing Packer Depth: Tubing Multiple Packer:
Open Hole Top: Open Hole Bottom:
No Initial Test Data was found for formation N-COM .
No Perforation Data was found for formation N-COM .