COGIS - COA/BMP Information

HIGHPOINT OPERATING CORPORATION           FOX CREEK 34-0758B           Well API # 05-123-49951           Status: XX        Status Date: 03/15/2019           Location ID #:460043       SESE 27 12N 63W WELD

COGIS - Conditions of Approval
COA Search Results - 6 record(s) returned.
Source
Document
Conditions of Approval
Form: (02 )
401788180
03/15/2019
Operator acknowledges the proximity of the listed offset well(s). Operator agrees to comply with the DJ Basin Horizontal Offset Policy to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the mitigated well(s), stating that appropriate mitigation was completed prior to the hydraulic stimulation of this well. Offset wells to mitigate: 05-123-07723, PETERS 16-34
Form: (02 )
401788180
03/15/2019
1) Submit Form 42 online to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after setting surface casing. Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) All: Within 60 days of rig release, prior to stimulation. 2) Delayed completion: 6 months after rig release, prior to stimulation. 3) All: Within 90 days after first sales, as reported on the Form 5A, Completed Interval Report.
Form: (02 )
401788180
03/15/2019
Operator shall submit a Form 27, Site Investigation and Remediation Workplan, to investigate possible impacts to groundwater from the hydraulic stimulation of the Fox Creek 501-3403H well (API 05-123-42583) without any mitigation being performed on the Peters #16-34 well (API 05-123-07723). Operator will include an implementation schedule with the Form 27. The Form 27 will be reviewed and approved by COGCC Environmental Staff. Operator shall cooperate with Staff to cure any deficiencies in its Form 27 submission and undertake all required investigation and remediation (if any) until Staff is satisfied that no impacts occurred or any identified impacts have been remediated. Operator shall not stimulate any well within 1,500' of the Peters #16-34 well prior to completion of the groundwater investigation.
Form: (02 )
401788180
03/15/2019
Operator shall not conduct any stimulation of this well within 1,500 feet of the Peters #16-34 well (API 05-123-07723) prior to mitigation being performed on the Peters #16-34 well in compliance with the DJ Basin Horizontal Offset Policy (June 20, 2013; Rev. December 17, 2013). Operator shall submit a Form 42 Notice of Offset Mitigation Completed within one (1) week of mitigation completion.
Form: (02 )
401788180
03/15/2019
Multi Well Open-Hole Logging – Rule 317.p: Alternative Logging Program: One of the first wells drilled on the pad will be logged with open-hole resistivity log and gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall state “Alternative Logging Program -No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run.
Form: (02 )
401788180
03/15/2019
Operator will ensure the wellbore beyond the unit boundary setback is physically isolated and is not completed. In the Operator Comments on the Form 5A the operator will (1) report the footages from the section lines of the bottom of the completed interval (2) describe how the wellbore beyond the unit boundary setback is physically isolated and (3) certify that none of the wellbore beyond the setback was completed.


COGIS - Best Management Practices
BMPSearch Results - 2 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02 )
401788180
03/15/2019
Drilling/Completion Operations
HighPoint will adhere to the COGCC Policy for Bradenhead Monitoring effective 5/29/12.
Form: (02 )
401788180
03/15/2019
Drilling/Completion Operations
Multi Well Open-Hole Logging – Rule 317.p: Alternative Logging Program: One of the first wells drilled on the pad will be logged with open-hole resistivity log and gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall state “Alternative Logging Program -No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run.