COGIS - COA/BMP Information

SRC ENERGY INC           Sanford 26C-27-XR           Well API # 05-123-49921           Status: XX        Status Date: 03/11/2019           Location ID #:329853       NENW 29 5N 66W WELD

COGIS - Conditions of Approval
COA Search Results - 5 record(s) returned.
Source
Document
Conditions of Approval
Form: (02 )
401874209
03/11/2019
Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test: 1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
Form: (02 )
401874209
03/11/2019
Operator acknowledges the proximity of the following non-operated listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Gold 1 (123-10726) Strong 2-8 (123-11406) Strong 3-15 (123-11611) UPRC 27-11C (123-15654) UPRC 27-12C (123-15655) UPRC 27-3C (123-17538) UPRC 27-4C (123-17594) UPRC 27-5C (123-17595) Wiedeman 1 (123-11895) Coltrane-PM J 28-4 (123-13988) Wiedeman-PM J28-2 (123-14002) Wiedeman 28-1H6 (123-18029) IGO 28-3H6 (123-18373) Wiest J 28-25 (123-26341) Wiedeman J 28-17 (123-26527) Wiedeman J 28-18D (123-29472) Wiedeman J 28-21D (123-29473) IGO Farms J 28-19D (123-30887) IGO Farms J 28-20D (123-30889) IGO Farms J 28-32D (123-30891) IGO Farms J 28-31D (123-30895) UPRC 29-8C (123-16442) UPRC 29-7C (123-16443) Kammerzell 29-3H6 (123-17937) Kammerzell 29-4H6 (123-17938) Kammerzell 29-6H6 (123-17940) Carlson 10-29 (123-20662) Carlson 20-29 (123-21689)
Form: (02 )
401874209
03/11/2019
Operator acknowledges the proximity of the listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. HSR-Wiedeman 14-20 (123-19139) HSR-Wiedeman 15-20 (123-19140) Calvin 1 (123-10686) A.J. Gold 22-13 (123-17189) Shafto J27-10 (123-15600) UPV 27-7H6 (123-18473) UPV 27-2H6 (123-18477) UPV 29-1H6 (123-18650) UPV 29-2H6 (123-18651) Bensler J 29-21D (123-29136)
Form: (02 )
401874209
03/11/2019
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered.
Form: (02 )
401874209
03/11/2019
Operator will ensure the wellbore beyond the unit boundary setback is physically isolated and is not completed. In the Operator Comments on the Form 5A the operator will (1) report the footages from the section lines of the bottom of the completed interval (2) describe how the wellbore beyond the unit boundary setback is physically isolated and (3) certify that none of the wellbore beyond the setback was completed.


COGIS - Best Management Practices
BMPSearch Results - 7 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02 )
401874209
03/11/2019
Planning
604.c.(2)J.i Blowout Prevention Equipment (“BOPE”): A double ram and annular preventer will be used during drilling. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid.
Form: (02 )
401874209
03/11/2019
Planning
604.c.(2)J.ii Backup stabbing valves be required on well servicing operations during reverse circulation. Valves shall be pressure tested before each well servicing operation using both low-pressure air and high-pressure fluid.
Form: (02 )
401874209
03/11/2019
Drilling/Completion Operations
RULE 604.c.I: Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections shall be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing shall be conducted and the documented results shall be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing shall be conducted on a daily basis when practicable.
Form: (02 )
401874209
03/11/2019
Drilling/Completion Operations
604.c.(2)L. Closed chamber drill stem tests shall be allowed. All other drill stem tests shall require approval by the Director. None planned for this well.
Form: (02 )
401874209
03/11/2019
Drilling/Completion Operations
Multi Well Open-Hole Logging – Rule 317.p: Alternative Logging Program: One of the first wells drilled on the pad will be logged with open-hole resistivity log and gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall state “Alternative Logging Program -No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run.
Form: (02 )
401874209
03/11/2019
Drilling/Completion Operations
Operator will comply with COGCC policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg area dated May 29, 2012.
Form: (02 )
401874209
03/11/2019
Drilling/Completion Operations
Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling.