Form: (02A )
401656263
11/06/2018
The Approved Form 2A permit will be posted at the location during construction, drilling, and completions operations.


COGIS - Best Management Practices
BMPSearch Results - 26 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02A )
401656263
11/06/2018
Planning
604.c(2)M. The location will be adequately fenced to restrict access by unauthorized persons.
Form: (02A )
401656263
11/06/2018
Planning
604.c.(2).H. Blowout Prevention Equipment (“BOPE”): A double ram and annular preventer will be used during drilling. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid.
Form: (02A )
401656263
11/06/2018
Planning
604.c.(2)J.i & ii. Backup stabbing valves will be required on well servicing operations during reverse circulation. Valves shall be pressure tested before each well servicing operation using both low-pressure air and high-pressure fluid.
Form: (02A )
401656263
11/06/2018
Planning
604.c.(2)N. Control of fire hazards: All material that is considered a fire hazard shall be a minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall comply with API IRP 500 and will comply with the current national electrical code. Flammable liquids shall not be stored within fifty (50) feet of the wellbore, except for the fuel in the tanks of operating equipment or supply for injection pumps. Where terrain and location configuration do not permit maintaining this distance, equivalent safety measures should be taken.
Form: (02A )
401656263
11/06/2018
Planning
604.c.(2).E. This location will be a multi-well pad, located in a manner which allows for the greatest distances possible from building units.
Form: (02A )
401656263
11/06/2018
Planning
Operator certifies that the MLVTs will be designed and implemented consistent with the COGCC Policy on the Use of Modular Large Volume Tanks in Colorado. MLVT Design Package, certified and sealed by a licensed professional engineer, is available upon request.
Form: (02A )
401656263
11/06/2018
Traffic control
604.c.(2)D: If required by the local government, a traffic plan shall be coordinated with the local jurisdiction (Johnstown) prior to commencement of move in and rig up. Any subsequent modification to the traffic plan must be coordinated with the local jurisdiction.
Form: (02A )
401656263
11/06/2018
General Housekeeping
604.c.(2)P. Trash Removal: All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as applicable.
Form: (02A )
401656263
11/06/2018
General Housekeeping
604.c(2)M. The location will be adequately fenced to restrict access by unauthorized persons
Form: (02A )
401656263
11/06/2018
Storm Water/Erosion Control
The location will be built to control stormwater runoff in a manner that minimizes erosion, transport of sediment offsite, and site degradation, including installation of a diversion ditch, berm with sediment traps, and wattles where necessary. Flowline and/or gathering lines will be co-located when feasible and Extraction will mitigate any erosion problems that arise due to the construction of any pipeline(s).
Form: (02A )
401656263
11/06/2018
Material Handling and Spill Prevention
604.c.(2)F. Leak Detention Plan: Extraction will monitor production facilities weekly at a minimum to a maximum of daily to identify fluid leaks, including, but not limited to, visually inspecting all wellheads, tanks and fittings. Additionally annual SPCC inspections will be conducted and documented. Annual flowline testing will also occur according to COGCC Rules 1101 and 1102. Inspection and record retention of flowline testing will be in accordance per COGCC regulation. All records will be made available to the COGCC upon request.
Form: (02A )
401656263
11/06/2018
Material Handling and Spill Prevention
604.c.(2)R Tank Specifications: Tanks will be designed, constructed and maintained in accordance with NFPA Code 30 (2008 version). All tanks are visually inspected by the operator weekly at a minimum to a maximum of daily and annual SPCC inspections will be conducted and documented. Inspection and record retention of tank inspections will be in accordance per SPCC regulation. All records will be made available to the COGCC upon request.
Form: (02A )
401656263
11/06/2018
Material Handling and Spill Prevention
604.c.(2).G. Berm construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked weekly at a minimum to a maximum of daily to ensure proper working condition. Secondary containment devices shall be sufficiently impervious to contain any spilled or released material. No potential ignition sources shall be installed inside the secondary containment area unless the containment area encloses a fired vessel.
Form: (02A )
401656263
11/06/2018
Dust control
604.c.(2)S. Access Roads: The access road will be constructed to accommodate local emergency vehicles. This road will be maintained for access at all times. Traffic will be routed to minimize local interruption. During construction and through the life of this location, Operator may use methods including, but not limited to, watering via water trucks to control fugitive dust. Additionally, the access road will be constructed with aggregate road base material and vehicle speeds will be limited to reduce dust.
Form: (02A )
401656263
11/06/2018
Construction
604.c.(2).Q. Guy line anchors will not be used on this location. Base beam units will be used as alternative.
Form: (02A )
401656263
11/06/2018
Noise mitigation
604.c.(2)A. Sound walls and/or hay bales will be used during drilling and completion operations. Sound walls will be installed along the northwest and south sides of the pad.
Form: (02A )
401656263
11/06/2018
Emissions mitigation
Operator will bring a new or expand existing gas sales lines, prior to first gas sales, in a timely manner, to send salable quality gas immediately down the sales line. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, the operator shall not produce the wells without an approved variance per Rule 805.b.(3)C.
Form: (02A )
401656263
11/06/2018
Emissions mitigation
604.c.(2)C.i. Green Completions - Emission Control System. Test separators, associated flow lines and sand traps shall be installed on-site to accommodate green completions techniques pursuant to COGCC Rules.
Form: (02A )
401656263
11/06/2018
Emissions mitigation
604.c.(2).I. BOPE testing for drilling operations. Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections shall be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing shall be conducted and the documented results shall be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing shall be conducted on a daily basis when practicable.
Form: (02A )
401656263
11/06/2018
Emissions mitigation
604.c.(2)C.iii. Green Completions - Emission Control System. During flowback, production will be sent through a high-pressure separator and into separate sealed oil and water tanks. The tanks will have a dedicated VOC line to capture any vapors. VOC lines are routed at a minimum of 75’ away from the tanks to a combustor to burn. Any sales gas from the separator will be routed at a minimum of 75’ away to an enclosed combustor to burn. This is only until the well cleans up to the point that it can go down the flowline to the production facility.
Form: (02A )
401656263
11/06/2018
Emissions mitigation
604.c.(2)C.ii. Uncontrolled venting shall be prohibited in an Urban Mitigation Area
Form: (02A )
401656263
11/06/2018
Drilling/Completion Operations
604.c.(2).K. Pit level Indicators shall be used on location.
Form: (02A )
401656263
11/06/2018
Drilling/Completion Operations
604.c.(2).O. All loadlines shall be bull plugged or capped.
Form: (02A )
401656263
11/06/2018
Drilling/Completion Operations
604.c.(2)B.i. Operator will be utilizing a closed loop system.
Form: (02A )
401656263
11/06/2018
Final Reclamation
604.c.(2)T. Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. Identification of plugged and abandoned wells will be identified pursuant to 319.a.(5)
Form: (02A )
401656263
11/06/2018
Final Reclamation
604.c.(2).U. The operator shall identify the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). The operator shall also inscribe or imbed the well number and date of plugging upon the permanent monument