COGIS - COA/BMP Information

GMT EXPLORATION COMPANY LLC           MCC 3-66 25-27 13HN           Well API # 05-001-10182           Status: XX        Status Date: 07/27/2018           Location ID #:456346       SESE 25 3S 66W ADAMS

COGIS - Conditions of Approval
COA Search Results - 3 record(s) returned.
Source
Document
Conditions of Approval
Form: (02 )
401458039
07/27/2018
Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3) and ensure all applicable documentation is submitted. Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. API # 001-06569, GRIMM #16-25
Form: (02 )
401458039
07/27/2018
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after setting surface casing.
Form: (02 )
401458039
07/27/2018
Operator will insure the wellbore beyond the unit boundary setback is physically isolated and is not completed. In the Operator Comments on the Form 5A the operator will (1) report the footages from the section lines of the bottom of the completed interval (2) describe how the wellbore beyond the unit boundary setback is physically isolated and (3) certify that none of the wellbore setback was completed.


COGIS - Best Management Practices
BMPSearch Results - 4 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02 )
401458039
07/27/2018
Drilling/Completion Operations
One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
Form: (02 )
401458039
07/27/2018
Drilling/Completion Operations
Operator acknowledges and will comply with COGCC policy for Bradenhead monitoring during Hydraulic Fracturing treatments in the Greater Wattenberg Area dated May 29, 2012.
Form: (02 )
401458039
07/27/2018
Drilling/Completion Operations
Surface casing will be run to adequate depths in accordance with Rule 317A.
Form: (02 )
401458039
07/27/2018
Drilling/Completion Operations
Prior to drilling operations, operator will perform an anti-collision scan of existing wells that have the potential of being within close proximity of the proposed well. This anti-collision scan will include definitive MWD or gyro surveys of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed well path with its respective error of uncertainty. If current surveys do not exist for the offset wells, operator may have gyro surveys conducted to verify bottom hole location. The proposed well will only be drilled if the anti-collision scan results indicate that there is not a risk for collision, or harm to people or the environment.