COGIS - COA/BMP Information

BP AMERICA PRODUCTION COMPANY           Cox 3           Well API # 05-007-06333           Status: XX        Status Date: 07/30/2018           Location ID #:456328       SWNW 14 32N 6W ARCHULETA

COGIS - Conditions of Approval
COA Search Results - 3 record(s) returned.
Source
Document
Conditions of Approval
Form: (02 )
401650962
07/26/2018
1)The production casing string shall be cemented from the casing shoe to the surface by circulation methods. Verify production casing cement coverage with a cement bond log. 2) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 608) if not done previously. 3) If borehole problems occur while drilling and an unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Engineer for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Craig Burger – Area Engineer 970-625-2497 ext 2 office 970-319-4194 cell Craig.burger@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Southwestern Colorado San Juan Basing ONLY” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Regulation, Forms, Form 2-Permit to Drill, Instructions 4) Contact COGCC Engineer – Craig Burger when encountering kicks requiring a mud weight increase of 0.5 ppg to control the kick, unexpected water flows, and unexpected Hydrogen Sulfide.
Form: (02 )
401650963
07/30/2018
1)The production casing string shall be cemented from the casing shoe to the surface by circulation methods. Verify production casing cement coverage with a cement bond log. 2) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 608) if not done previously. 3) If borehole problems occur while drilling and an unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Engineer for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Craig Burger – Area Engineer 970-625-2497 ext 2 office 970-319-4194 cell Craig.burger@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Southwestern Colorado San Juan Basing ONLY” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Regulation, Forms, Form 2-Permit to Drill, Instructions 4) Contact COGCC Engineer – Craig Burger when encountering kicks requiring a mud weight increase of 0.5 ppg to control the kick, unexpected water flows, and unexpected Hydrogen Sulfide.
Form: (02 )
401650965
07/30/2018
1)The production casing string shall be cemented from the casing shoe to the surface by circulation methods. Verify production casing cement coverage with a cement bond log. 2) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 608) if not done previously. 3) If borehole problems occur while drilling and an unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Engineer for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Craig Burger – Area Engineer 970-625-2497 ext 2 office 970-319-4194 cell Craig.burger@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Southwestern Colorado San Juan Basing ONLY” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Regulation, Forms, Form 2-Permit to Drill, Instructions 4) Contact COGCC Engineer – Craig Burger when encountering kicks requiring a mud weight increase of 0.5 ppg to control the kick, unexpected water flows, and unexpected Hydrogen Sulfide.


COGIS - Best Management Practices
BMPSearch Results - 3 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02 )
401650962
07/26/2018
Drilling/Completion Operations
The pilot will be logged as follows: Open-hole resistivity and gamma-ray logs will be run from TD to the surface casing shoe and a Cement Bond Log will be run on production casing.
Form: (02 )
401650963
07/30/2018
Drilling/Completion Operations
Laterals will be logged with gamma ray only.
Form: (02 )
401650965
07/30/2018
Drilling/Completion Operations
Laterals will be logged with gamma ray only.