COGIS - COA/BMP Information

LONGS PEAK RESOURCES LLC           Oxnard West 0607-5NH           Well API # 05-123-46217           Status: XX        Status Date: 12/29/2017           Location ID #:452454       SESW 31 12N 66W WELD

COGIS - Conditions of Approval
COA Search Results - 2 record(s) returned.
Source
Document
Conditions of Approval
Form: (02 )
401334899
12/05/2017
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) All: Within 60 days of rig release, prior to stimulation. 2) Delayed completion: 6 months after rig release, prior to stimulation. 3) All: Within 30 days of first production, as reported on Form 5A.
Form: (02 )
401334899
12/05/2017
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log.


COGIS - Best Management Practices
BMPSearch Results - 1 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02 )
401334899
12/29/2017
Drilling/Completion Operations
Multi Well Open Hole Logging One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No openhole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.