WIEPKING-FULLERTON ENERGY LLC           Good Deal 13           LOCATION ID # 443451           Status: AC        Status Date: 05/01/2019           Location : SWSW 16 10S 55W LINCOLN

COGIS - Conditions of Approval
COA Search Results - 3 record(s) returned.
Source
Document
Conditions of Approval
Form: (02A )
400888280
10/02/2015
Based on NRCS Map Unit Description, Haverson loam form on Floodplains. Although FIRM Maps for much of Lincoln County are not available, Location may be considered to lie within a potential floodplain based on proximity and geomorphic setting in conjunction with the soil description. Operator shall be in compliance with Rule 603.h.
Form: (02A )
400888280
10/02/2015
Loxcation lies within close proximity to Sand Creek. Operator shall implement tertiary containment along the cross- and downgradient perimeters of the Location.
Form: (02A )
400888280
10/02/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.


COGIS - Best Management Practices
BMPSearch Results - 1 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02A )
400888280
10/02/2015
Storm Water/Erosion Control
BMP Plan Wiepking-Fullerton Energy, L.L.C. 4600 S. Downing St. Englewood, CO 80113 303-789-1798 303-761-9067 (fax) Certification to Discharge Under CDPS General Permit COR-03000 Stormwater Discharges Associated with Construction Certification Number COR 39788 Good Deal # 13 well T10S, R55W Sec. 16: SW1/4SW1/4 Lincoln County, Colorado Description of Well Site and Construction Area 1-3 acre site with access road for drilling of oil and gas well. Terrain is flat with native grass and sagebrush. Surface water area Sand Creek, which is dry, located 450' west of well stake. Man-made pond located 150’ south of well stake. Both areas will not be disturbed by drilling operations. Dirt berm will be installed on the west and south sides of well pad to protect this area Surface Roughening will be used on low side of drill site to reduce speed of runoff, increase infiltration, reduce erosion, trap sediment and prepare soil for reseeding. Dig Mud Pit 6’ deep with 30 mil liner which will be removed after drilling operations and pit reclaimed. No Water pit. Operator will use approved E & P Waste Management Plan to have all water based mud and cutting trucked to adjacent well. Topsoil will be separated and spread on drill site as final operation before reseeding operations. To prevent soil erosion site will be disked and straw crimped in or manure spread. Reclamation will begin within 6 months weather permitting Stormwater Management Plan (SWMP) is on file in Wiepking-Fullerton Energy, L.L.C. office. Spill Prevention, Control and Countermeasure Plan are on file in Wiepking-Fullerton Energy, L.L.C. office.