COGIS - Conditions of Approval
COA Search Results - 12 record(s) returned.
Source
Document
Conditions of Approval
Form: (02 )
400785304
08/26/2015
1.Injection is not authorized until approval of Forms 31 and 33. 2.Operator required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. 3.Prior approval of Form 4 is required for step rate and injectivity tests. 4.Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 5.For all new drill Underground Injection Control wells a suite of open-hole Resistivity/Gamma Ray and Density/Neutron logs is required from Surface Casing shoe to TD. A PDF, TIFF, or PDS visual image and a LAS or DILS file version of each log is required. 6. Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted.
Form: (02 )
400785304
08/26/2015
1) Note surface casing setting depth change from 500’ to 655’. Increase cement coverage accordingly and cement to surface 2) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 3) Comply with Rule 317.j and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
Form: (02 )
401384112
05/21/2018
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.j and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
Form: (02 )
401384112
05/21/2018
1.) Injection is not authorized until approval of Forms 31 and 33. 2.) Operator required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. 3.) Prior approval of Form 4 is required for step rate and injectivity tests. 4.) Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 5.)For all new drill Underground Injection Control wells a suite of open-hole Resistivity/Gamma Ray and Density/Neutron logs is required from Surface Casing shoe to TD. A PDF, TIFF, or PDS visual image and a LAS or DLIS file version of each log is required. 6.) Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted.
Form: (02 )
401384112
05/21/2018
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test: 1) Within 60 days of rig release and prior to stimulation or 2) If a delayed completion, 6-7 months after rig release and prior to stimulation. 3) Within 30 days after first production, as reported on Form 5A.
Form: (02 )
401851481
03/11/2019
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 48 hour spud notice for all subsequent wells drilled on the pad. 2) Comply with Rule 317.j and provide cement coverage from the end of production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after all aquifers are covered.
Form: (02 )
401851481
03/11/2019
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) Within 60 days of rig release, prior to stimulation. 2) 6 months after rig release, prior to stimulation. 3) Within 60 days of first production, as reported on Form 5A.
Form: (02 )
401851481
03/11/2019
1.Injection is not authorized until approval of Forms 31 and 33. 2.Operator required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. 3.Prior approval of Form 4 is required for step rate and injectivity tests. 4.Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 5.For all new drill Underground Injection Control wells a suite of open-hole Resistivity/Gamma Ray and Density/Neutron logs is required from Surface Casing shoe to TD. A PDF, TIFF, or PDS visual image and a LAS or DILS file version of each log is required. 6. Operator must provide all tops of formations encountered from surface to TD on the Form 5 when submitted.
Form: (04 )
402067864
06/28/2019
Submit Form 5 with appropriate paperwork when conductor is set.
Form: (04 )
402067864
06/28/2019
Sent back to DRAFT at operator's request to allow them to update casing information and add additional injection formation.
Form: (04 )
402067864
06/28/2019
Operator may not begin set up and drilling of the well until COGCC receives written documentation that the landowner, Mr. Leffler, approves of the plan to install two conductor strings for protection of his underground drainage system.
Form: (04 )
402067864
06/28/2019
Operator is required to set 5-1/2" Liner so that gap between the Top of Liner and Bottom of 1st String Casing is between 50 and 100 ft. Gap between the Top of Liner and Bottom of 1st String Casing is typically 50-100 ft. Original Form 2 configuration was Top of Liner @ 8075 ft and Bottom of 1st String @ 9024 ft. That is a gap of 949 ft which is too great. Current proposal is for Top of Liner @ 8980 ft and Bottom of 1st String @ 8990 ft, a gap of 10 ft which is too small.


COGIS - Best Management Practices
BMPSearch Results - 10 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02 )
400785304
08/26/2015
Drilling/Completion Operations
Open-hole Resistivity Log with Gamma Ray Log will be run from TD into the surface casing. A Cement Bond Log with Gamma-Ray will be run on production casing, or on intermediate casing if a production liner is run. The Form 5, Completion Report, will list all logs run and have those logs attached
Form: (02 )
401384112
05/21/2018
Drilling/Completion Operations
Green Completions – No hydrocarbons are anticipated in this well.
Form: (02 )
401384112
05/21/2018
Drilling/Completion Operations
Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be used during drilling. At least the drilling company shall have a valid well blowout prevention certifications.
Form: (02 )
401384112
05/21/2018
Drilling/Completion Operations
BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid.
Form: (02 )
401384112
05/21/2018
Drilling/Completion Operations
Drill stem tests. Not applicable; no Drill Stem tests are planned.
Form: (02 )
401384112
05/21/2018
Final Reclamation
Identification of plugged and abandoned wells. P&A’d wells shall be identified pursuant to 319.a.(5).
Form: (02 )
401851481
03/11/2019
Drilling/Completion Operations
For all new and converted Underground Injection Control wells a Cement Bond Log (CBL) is a required on the cased portions of the hole from the bottom of the casing to the top of the next shallower casing string for all casing strings other than the Surface Casing. Only a PDF visual image is required.
Form: (02 )
401851481
03/11/2019
Drilling/Completion Operations
A Mud log is required containing at least the following information: Rate of Penetration Log, and the location of any drilling breaks or zones of lost circulation.
Form: (02 )
401851481
03/11/2019
Final Reclamation
604.c.(2)T. Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. Identification of plugged and abandoned wells will be identified pursuant to 319.a.(5)
Form: (02 )
401851481
03/11/2019
Final Reclamation
604.c.(2).U. Final Reclamation-The operator shall identify the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). The operator shall also inscribe or imbed the well number and date of plugging upon the permanent monument.