COGIS - COA/BMP Information

CONFLUENCE DJ LLC           Middlepark 18           LOCATION ID # 442024           Status: AC        Status Date: 01/23/2019           Location : SESW 18 4N 62W WELD

COGIS - Conditions of Approval
COA Search Results - 2 record(s) returned.
Source
Document
Conditions of Approval
Form: (02A )
400731743
06/13/2015
Unnecessary or excessive flaring is prohibited. Operator shall direct all salable quantity gas to a sales line as soon as practicable or shut in and conserved.
Form: (02A )
401622843
07/25/2018
Location lies within a Sensitive Area within proximity to a surface water feature. Operator shall use tertiary containment along the cross- and down-gradient perimeter of the Location.


COGIS - Best Management Practices
BMPSearch Results - 7 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02A )
400731743
06/13/2015
Construction
Operator shall submit a Form 42 to the COGCC 48 hours prior to commencement of construction activities.
Form: (02A )
400731743
06/13/2015
Construction
The following procedure describes BCEOC standard construction practices for setting a partially buried pre-cast cement water vault and new tank battery construction. 1) The excavation will first be lined with 4” of clay or other low permeability soil. 2) A 30 mil liner will be installed on top of the low permeability soil. The 30 mil liner will be a contiguous liner which will underlay the entire tank battery. 3) The tank battery / water vault liner will be keyed into a galvanized steel containment ring installed surrounding the tank battery. 4) Sand bedding will be installed to protect the synthetic liner prior to placing equipment in the containment area.
Form: (02A )
400731743
06/13/2015
Drilling/Completion Operations
BMP-Bonanza Creek Energy acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014.
Form: (02A )
401254440
07/19/2017
Planning
Operator shall submit a Form 42 to the COGCC 48 hours prior to commencement of construction activities.
Form: (02A )
401254440
07/19/2017
Drilling/Completion Operations
Bonanza Creek Energy acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014.
Form: (02A )
401622843
07/25/2018
Storm Water/Erosion Control
Confluence will maintain a Stormwater Management Plan with site specific measures to assess erosion control. Confluence will make thorough inspections, in accordance with the requirements set forth by CDPHE Water Quality Division (WQD). The inspection schedule is as follows: While site is under construction, an inspection is required at least every 14 calendar days; Post storm event inspections must be conducted within 24 hours after the end of any precipitation or snowmelt event that causes surface erosion. Inspection records will be kept on file for a minimum of three (3) years from expiration or inactivation of permit coverage. These records will be made available to the regulatory agencies upon request.
Form: (04 )
401770191
09/27/2018
Drilling/Completion Operations
Operator Certifies that the MLVT will be designed and implemented according to the COGCC MLVT Policy dated June 13, 2014 and that there are no building units down gradient from the proposed MLVT.