COGIS - COA/BMP Information

URSA OPERATING COMPANY LLC           Frei A17           Well API # 05-045-19946           Status: XX        Status Date: 04/02/2018           Location ID #:417777       SWSW 7 6S 91W GARFIELD

COGIS - Conditions of Approval
COA Search Results - 6 record(s) returned.
Source
Document
Conditions of Approval
Form: (02 )
400075522
09/29/2010
1)COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. 2)GARFIELD COUNTY RULISON FIELD NOTICE TO OPERATORS. NOTE: ALL NOTICES SHALL BE GIVEN VIA E-MAIL. SEE ATTACHED NOTICE 3)NEW MAMM CREEK FIELD NOTICE TO OPERATORS APPLIES TO THIS WELL. NOTE: ALL NOTICES SHALL BE GIVEN VIA E-MAIL. SEE ATTACHED NOTICE 4)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 380 FEET DEEP. 5)THE BRADENHEAD PRESSURE MONITORING, REQUIRED BY THE MAMM CREEK FIELD NOTICE TO OPORATORS, MUST BE REPORTED TO COGCC ON THE NEXT FOUR WELLS DRILLED ON THIS PAD (WELLS 5 -8) VIA SUNDRY NOTICE. APPROVAL IS REQUIRED PRIOR TO STARTING TO DRILL THE 9TH PRODUCTION HOLE INTERVAL ON THE PAD. EMAIL SUNDRY NOTICE TO KEVIN.KING@STATE.CO.US
Form: (02 )
401586057
07/22/2018
1)Operator shall comply with the most current revision of the Northwest Notification Policy. 2)Operator shall comply with the most current revision of the Garfield County Rulison Field Notice to Operators, with the following exception: All field notice requirements specified in that Notice to Operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see Condition of Approval #1). 3)Operator shall comply with the most current revision of the Mamm Creek Field Notice to Operators, with the following exception: All field notice requirements specified in that Notice to Operators are superseded by the requirements of the most current revision of the Northwest Colorado Notification Policy (see Condition of Approval #1). Operator shall submit the primary cement job Cement Bond Log (CBL) with either the Form 4 Sundry Notice - Request to Complete or the Form 5 Drilling Completion Report. 4)Operator shall comply with the Notice to Operators Drilling Wells in the Buzzard, Mamm Creek, and Rulison fields, Garfield County and Mesa County – Procedures and Submittal Requirements for Compliance with COGCC Order Nos. 1-107, 139-56, 191-22, and 369-2 (July 8, 2010). 5)Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to a minimum of 500' above the Lower Wasatch (as defined by COGCC in the report "Casing and Cement Standards for Geologic Isolation Piceance Basin Bradenhead Monitoring Area and Nearby Fields," dated April 18, 2016, COGCC Document No. 2056199, Appendix A Field Scout Cards and Annotated Type Logs) to provide isolation of all Mesaverde Group and underlying formations, if penetrated, the Ohio Creek Formation, and the lower portion of the Wasatch Formation. Verify production casing cement coverage with a cement bond log. This requirement shall supersede the top of cement requirements in the Mamm Creek Field Notice to Operators.
Form: (02 )
401586057
07/22/2018
This Permit to Drill is approved subject to all the BMP’s and COA’s on the most recently approved Form 2A and any subsequently approved Form 4 for the Oil and Gas Location (Location ID # 417777). The most recently approved Form 2A and any subsequent Form 4’s containing applicable COA’s for this location shall be posted onsite during construction, drilling, and completions operations.
Form: (02 )
401586057
07/22/2018
Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017).
Form: (02 )
401586057
07/22/2018
If conductors are preset, operator shall comply with Notice to Operators: Procedures for Preset Conductors (dated September 1, 2016, revised October 6, 2016).
Form: (02 )
401586057
07/22/2018
The moisture content of water/bentonite based mud (WBM) generated drill cuttings managed onsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. The operator has indicated in the ‘DRILLING WASTE MANAGEMENT PROGRAM SECTION’ of the Form 2A; that ‘Cuttings Disposal’ will be “OFFSITE” and that the ‘Cuttings Disposal Method’ will be “Beneficial reuse”, ‘Other Disposal Description’ as “PLEASE SEE ATTACHED WASTE MANAGEMENT PLAN”. Any proposed offsite disposal or beneficial reuse of cuttings to another oil and gas location shall not occur until approval of a Form 4 Sundry Notice specifying disposal or beneficial reuse location and cuttings material sampling and characterization methods. Remediated or amended cuttings shall not be made available as fill material to the general public. Any changes to drill cuttings management and disposal on this location will require submittal (via a Form 4 Sundry Notice) and approval of a Beneficial Reuse Plan detailing the changes (specifying cuttings characterization methods, cuttings management, amendment, and onsite disposal location[s]). Any of the WBM drill cuttings that will remain on the well pad location must be sampled and meet the applicable standards of Table 910-1.


COGIS - Best Management Practices
BMPSearch Results - 2 record(s) returned.
Source
Document
BMP TypeBMP
Form: (02 )
401586057
07/22/2018
Planning
DUST CONTROL - The pad and access road will be graveled to reduce fugitive dust. In addition, water and other dust suppressants may be used as required, dependent upon the level of activity, moisture conditions, etc. ODORS - Combustor controls will be used to mitigate odors from production tanks. ODORS - Well completions will utilize flowback completion technologies and/or flares to reduce odors from plug drill-out, and venting of salable and non-salable gas NOISE – Noise levels will be monitored in accordance with COGCC regulations and any COAs. LIGHT – All lights will be aimed inward and downward on the drill pad to prevent fugitive light from leaving the pad location.
Form: (02 )
401586057
07/22/2018
Drilling/Completion Operations
Existing wells on the pad logged with open-hole resistivity log with gamma-ray, from TD into the surface casing (Frei A9, 05-045-19641; Frei A11, 05-045-19640; Frei A21, 05-045-19639). All wells on the pad will have a cement bond log (CBL) with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached.The Form 5 for a well without open-hole logs will state “No open-hole logs were run” and will clearly identify the type of log and the well (by API#) in which open-hole logs were run.