295 - 1
12/24/1974
  
Orders maximum daily production of oil from wells producing both oil and gas from the "D" Sand underlying certain lands in the Lanyard Roggen Field Area not to exceed 25 barrels of oil. Orders operators to appear at hearing scheduled for January 7, 1975 to show cause why order should not be made permanent and present data in order for the Commission to determine what field rules should be adopted for production of oil and disposition of the casinghead gas.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder
295 - 2
01/07/1975
  
Limits maximum daily production of gas from any one well capable of producing both oil and gas from the "D" Sand to 100,000 cubic feet for a period of 20 days commencing 1/8/75. A 24 hour test period is permitted without limitation to determine well capacity for the gas plant. The limitation shall continue for a period of 20 days or until all the wells that have been completed to date in the area that are to be connected to the gas plant have been connected and that commencing 1/28/75 no gas shall be produced unless it is either (1) marketed and sold to supply domestic, industrial or municipal needs; or (2) used for lease development or operations and fuel.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder