Order Synopses for Cause Number 288  (07/22/2018)

Orders List
Advanced Search

      CAUSE 288
288 - 1
03/19/1974
  
Establishes 80 acre drilling and spacing units for the production of oil and associated hydrocarbons from the "J" Sand. Each unit shall consist of the E1/2 and W1/2 or the N1/2 and the S1/2 of a quarter section and the permitted well to be located in the center of the NE1/4 and the SW1/4 of each quarter section with a tolerance of 200 feet in any direction.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 2
08/20/1974
  
59W. 6th P.M. with a tolerance of 200 feet in any direction and that it be the permitted well for the unit consisting of the W1/2 SE1/4 of said Section 31; and for a well to be drilled in the center of the NW1/4 NW1/4 Section 6 T. 4S. R. 59W. 6th P.M. with a tolerance of 200 feet in any direction and that it be the permitted well for the unit consisting of the W1/2 NW1/4 of said Section 6. Statement as to action that can be taken to offset any advantage the excepted locations may have is included in order.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 3
11/19/1974
  
Denies application of Amoco Production Company requesting restriction on production from Well #2 Linnebur located in the NW1/4 SE1/4 Section 31 T. 3S. R. 59W. 6th P.M.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 4
11/19/1974
  
Grants an exception for a well to be drilled in the center of the SE1/4 NE1/4 Section 31 T. 3S. R. 59W. 6th P.M. with a tolerance of 200 feet in any direction to avoid surface hazards or obstructions and that it be the permitted well for the designated unit consisting of the E1/2 NE1/4 of said Section 31. Statement as to action that can be taken to offset any advantage the excepted location may have is included in order.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 5
12/17/1974
  
Restricts production from the "J" Sand in Well #2 Linnebur NW1/4 SE1/4 Section 6 T. 3S. R. 59W. and Well #2 Healey NW1/4 NW1/4 Section 6 T. 4S R. 59W. to 50% of the average daily oil production from all direct offset wells drilled in accordance with spacing pattern provided each exception well shall have a minimum daily allowable of 50 barrels. Provides for under and over production and requires production reports by wells to be filed before the 15th of each month in order to determine daily allowable for exception wells.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 6
01/21/1975
  
Limits daily production of gas from any one well capable of producing both oil and gas from the "J" Sand to 50,000 cubic feet for a period of 90 days commencing January 21, 1975. Commencing April 21,1975 no gas shall be produced unless it is either (1) marketed and sold to supply domestic, industrial or municipal needs or (2) used for lease development or operations and fuel. Further orders that Order 288 5 concerning restriction of wells drilled as exceptions be temporarily amended for purposes of this order to allow restriction of said wells to be 50% of average of offset wells drilled on pattern and that such allowable be based on monthly gas oil ratio tests.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 7
02/18/1975
  
Denies application of E. Doyle Huckabay, Ltd. and places no restriction at this time on production of Well #3 UPRR Linnebur located in the SE1/4 NE1/4 Section 31 T. 3S. R. 59W. 6th P.M. Lone Tree Field Adams and Arapahoe Counties.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 8
03/28/1975
  
Emergency Orders that production limitation as established by Order 288 6 for all wells in the Lone Tree Field shall remain in effect until a hearing can be held on April 4, 1975.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 9
04/04/1975
  
The intention of Order 288 6 is that production restriction as established shall be lifted for each well once the well has been connected to a gas market.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 10
05/20/1975
  
Grants exception for well to be drilled in the C NW1/4 SW1/4 Section 32 T. 3S. R. 59W. with 200 foot tolerance and that it be permitted well for unit consisting of W1/2 SW1/4 of said Section 32. Statement as to action that can be taken to offset any advantage is included in order.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 11
10/21/1975
  
Restricts production from Well #2 Linnebur NW1/4 SE1/4 Section 31 T. 3S. R. 59W. and Well #2 Healey NW1/4 NW1/4 Section 6 T. 4S. R. 59W. 6th P.M. to 70% of the allowable established by Order 288 5. Restricts production from Linnebur lease located in the S1/2 NE1/4 Section 31 T. 3S. R. 59W. to 70% of the production wells are capable of making as determined by productivity tests. Temporarily amends Rules 2 and 3 of Order 288 5 and productivity tests shall be taken on certain wells between the 1st and 15th of each month the results reported to the Commission by the 25th. Order shall remain in effect until overproduction has been made up.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 12
02/24/1976
  
Amends Orders 288 5 and 288 7 and restriction of production from the "J" Sand shall be placed on Well #2 Linnebur NW SE Section 31 T. 3S. R. 59W.; Well #2 Healey NW NW Section 6 T. 4S. R. 59W. and Well #3 UPRR Linnebur SE NE Section 31 T. 3S. R. 59W. based on a percentage based on the acre feet underlying said wells of the total daily capacity of production from said wells and direct offsets. Production capacity tests to be taken monthly. Under and over production to be adjusted on a monthly basis. The make up of overproduction by Order 288 11 to continue but based on allowables established by this order effective March 1, 1976.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 13
01/17/1977
  
Grants exceptions to the spacing of the Lone Tree Field as established by Order 288 1 for wells to be drilled in the C SE1/4 NE1/4 Section 30 T. 3S. R. 59W. and that it be the permitted well for unit consisting of E1/2 NE1/4 of said Section 30; the C NW1/4 SE1/4 Section 30 T. 3S., R. 59W. unit consisting of W1/2 SE1/4 of said section; and in the C NW1/4 SE1/4 Section 6 T. 4S. R. 59W. for unit consisting of W1/2 SE1/4 of said Section 6 all with a tolerance of 200 feet.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 14
01/17/1977
  
Extends spaced area of the Lone Tree Field by the addition of certain lands in Arapahoe County and making said lands subject to Order 288 1.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 15
06/20/1977
  
Grants exception to spaced pattern for a well to be located in the center of the SE1/4 NE1/4 Section 6 T. 4S. R. 59W. and that it be the permitted well for the unit consisting of the E1/2 NE1/4. Advantage Statement included.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 16
08/15/1983
  
Allows exceptions for well to be drilled in the NW NW Section 31 T. 3S. R. 59W. and a well to be drilled in the SE NW Section 6 T. 4S. R. 59W. and that they be the permitted wells provided existing well on each unit is shut in.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
288 - 17
  
  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS