Order Synopses for Cause Number 251  (07/22/2018)

Orders List
Advanced Search

      CAUSE 251
251 - 1
05/21/1972
  
Establishes 80 acre drilling and spacing units for the production of oil and associated hydrocarbons from the "D" and "J" Sands underlying certain lands in Irondale Field. Each such drilling unit shall be the W2 and E2 or the N2 and S2 of each quarter section, according to the governmental survey thereof, and the permitted well for each such drilling unit shall be located in the C NW4 SE4 of each quarter section with a tolerance of 200 feet in any direction to avoid surface hazards or obstructions.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 2
04/18/1972
  
Grants an exception for a well to be drilled in the C SW4 NE4 of Section 24 T2S R62W and that said well shall be the permitted well for the drilling unit upon which it is located; however, if a commercial well is completed at the location set forth above, the Commission shall take such action as will offset any advantage which the person securing the exception may have over other producers.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 3
05/23/1972
  
Grants an exception for a well to be drilled in the C SW4 SW4 Section 19 T2S R61W and that said well shall be the permitted well for the drilling unit consisting of the W2 SW4; however, if a commercial well is completed at the location set forth above, the operator shall appear at the next scheduled hearing following completion, and present such evidence as may be necessary in order for the Commission to prevent the production from the drilling unit of more than its just and equitable share of oil and gas.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 4
07/07/1972
  
Extends the field limits and establishes for the additional area 80 acre drilling and spacing units for production of oil from "D" and "J" Sands as provided for in Order 250 1. Further orders that no action shall be taken at this time concerning flaring of the casinghead gas; however, a hearing shall be held September 19, 1972 at which time a report on the completion of a gas processing plant shall be made.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 5
09/25/1972
  
Requires that the daily allowable calculated on a monthly basis for any well capable of producing both oil and gas from the "D" and/or "J" Sands shall be 10 barrels of oil or 25 MCF of gas, whichever is first produced. Wells which have a gas oil ratio in excess of 2,500 shall be granted an allowable as determined by formula. This limitation will be in effect until gas processing plant is completed and capable of receiving gas. Allows for 15 day test period without limitation for new wells. GOR to be taken during test period to determine allowable. Adjustment of overproduction to be discussed at future hearing.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 6
07/05/1973
  
Orders temporary relief from production limitations as established by Order 251 5 in order for plant operator of the Irondale Plant to obtain the amount of gas to operate plant. Further orders operators in the Irondale Field to appear at hearing scheduled for June 19, 1973 to present information to the Commission in order to determine field rules.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 7
06/19/1973
  
A gas plant nomination is to be submitted monthly by the operator of the Irondale Gas Processing Plant. Such nomination shall be used to determine daily gas allowable per well based on formula: Daily Gas Allowable = Gas Plant Nomination (MCFD) minus Deficient Well (MCF) divided by number of Connected Wells minus number of Deficient Connected Wells. Requests GOR tests monthly; transfer of allowables and production reports of gas by leases and oil by wells. To be effective August 1, 1973.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 8
08/15/1977
  
Allows an additional well to be drilled for the production of oil and associated hydrocarbons from the "D" Sand underlying unit consisting of the W2 SE4 Section 24 T2S R62W 6th PM, at a location 660 FSL and 1980 FEL of said Section 24.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 9
11/19/1979
  
Denies application of Ambra Oil & Gas Company for a well to be drilled as an exception to the spacing pattern for the field at a location in the SW4 NW4 Section 24 T2S R62W 6th PM.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 10
06/15/1981
  
Grants exception for well to be drilled in C SW4 SW4 Section 24 T2S R62W.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
251 - 11
10/20/1986
  
Allows additional well to be drilled on 80 acre unit SW SE Section 25 T2S R62W for production from "D" and "J" Sands.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS