      CAUSE 238
238 - 1
04/20/1971
  
Establishes 80 acre drilling and spacing units for production of oil from the "J" Sand; and each such drilling unit shall consist of two quarter quarter section lots or tracts or combination of tracts, and shall be the E2 and W2 or N2 and S2 of each quarter section. The permitted well for each such drilling unit shall be located in the C NW4 and SE4 of each quarter section with a tolerance of 200 feet in any direction. Operator will have options as to where the permitted wells will be located in the drilling unit adjacent to an area with different spacing patterns.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
238 - 2
06/30/1972
  
Grants temporary relief from production limitations established by Order 226 9 Peoria Field; Order 239 1 Latigo Field; and Order 237 6 Poncho Field; in order to allow operator of the Peoria Gas Processing Plant to load the expanded plant with gas from the above mentioned fields, as well as Hombre and Latigo Fields. Further orders operators in the fields to appear at a hearing on July 18, 1972 to present production and test data, in order for the Commission to determine what fields rules should be adopted, and to consider long range plans for allocation of gas to the expanded plant.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
238 - 3
07/18/1972
  
Grants exception for a well to be drilled 660 FSL and 1140 FEL of Section 29 T3S R61W 6th PM. Further orders for Hombre spaced area that exceptions may be granted without hearing to avoid surface hazards, provided waivers in writing are filed by owners of offset units toward which well location is moved.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
238 - 4
07/18/1972
  
A nomination of 600 1500 MCF of gas per day shall be allocated to the Hombre Field. A maximum daily production of gas from any one well producing both oil and gas from the "J" Sand shall not exceed 300 MCF. Provides for transfer of allowable production adjustments; requests GOR tests monthly, and production reports by wells. Further orders a hearing to be held February 1973 to review the matter.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
238 - 5
02/20/1973
  
Orders provisions of previous order to be continued, until such time as any interested party requests a hearing be held, to review the plans concerning the allocation of gas to the Peoria Gas Processing Plant.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
238 - 6
06/16/1989
  
Approves a Unit Agreement and Unit Operating Agreement for "J" Sand unit operations, with injection of fluids for the Colomeadow Farms Unit Area and that the spacing provisions established by Order No. 238 1 are rescinded for the Unit Area.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS
238 - 7
05/21/1990
  
Terminates the Unit Agreement and Unit Operating Agreement approved by Order No. 238 6, and places the former unit lands under the provisions of Rule 318.  Scanned Images of Hearing DocumentsHearing Files
Expanded OrdersOrder

  GIS Map of FieldGIS