Order Search


Return Count: 7
Cause NumberOrder NumberOrder DateField CodeField NameFormationDescription
121007-31-2018  NFCCOrder to stay acceptance of certain applications for permits-to-drill, Oil and Gas Location Assessments, and applications to establish drilling and spacing units in all or portions of Township 4 North, Range 65 West, 6TH P.M., Township 4 North, Range 64 West, 6TH P.M., Township 4 North, Range 63 West, 6TH P.M., Township 3 North, Range 65 West, 6TH P.M., Township 3 North, Range 64 West, 6TH P.M., Township 3 North, Range 63 West, 6TH P.M., Township 2 North, Range 64 West, 6TH P.M., and Township 2 North, Range 63 West, 6TH P.M., until such time as the Commission has entered an order on Noble’s application for a Comprehensive Drilling Plan.
2322310-19-198190750WATTENBERGJSNDAmends Order 232 20 and allows drilling of an additional well on each 320 acre unit in the area not included in Order 232 20.
4078702-19-1992  CODL, NB-CD, NBRRApproves the request to establish spacing for the Niobrara Formation for certain lands previously spaced for the Codell Formation and to allow the downhole commingling of production from the Codell and Niobrara Formations.
407260509-17-2018  NFCCApproves 7 drilling and spacing units, and a total of up to 15 horizontal wells within proposed DSU Nos. 1, 2, 3, 4, and 5; up to 7 horizontal wells within proposed DSU No. 10; and up to 23 horizontal wells within proposed DSU No. 11, for the production of oil, gas, and associated hydrocarbons from the Niobrara, Fort. Hays, Codell, and Carlile Formations.
407287807-31-2019  NBRRApproves pursuant to the provisions of §34-60-116, C.R.S., all interests in the designated horizontal wellbore spacing unit established for the Application Lands are hereby pooled, for the development and operation of the Niobrara Formation, effective as of the date the Application was filed.
493205-21-1991  SUSXApproves the request to establish 80 acre drilling and spacing units for certain lands for production from the Sussex formation and further to allow the downhole commingling of production from the Sussex formation with production from the Codell and Niobrara formations
4991511-16-199290750WATTENBERGDKTAApproves the Commission motion to establish 320-acre drilling and spacing units for certain lands previously not spaced in the lands covered by Cause No. 232, for production from the Dakota Formation, to provide for procedures to obtain exceptions to the permitted well locations and to allow the recompletion and downhole commingling of production from the Dakota, "J" Sand, Codell, Niobrara, Sussex and Shannon Formations.