Order Search


Return Count: 7
Cause NumberOrder NumberOrder DateField CodeField NameFormationDescription
164203-19-197973800RIVERSIDEJSNDRescinds Order 164 1 and operations in the area described therein to be governed by the general rules and regulations of the Commission.
40738011-29-2010  NBRRApproves the request for an order establishing twenty-one approximate 640-acre drilling and spacing units for various lands in Township 5 North, Ranges 61 and 62 West, 6th P.M. and Township 6 North, Range 62 West, 6th P.M., and allowing one horizontal well in each of the units, with initial penetration of the Codell and Niobrara Formations, lateral, and bottomhole location not closer than 460 feet from the boundaries of the unit.
40753001-23-2012  NBRRApproves the request for an order seeking a variance to the prescribed Rule 318A. surface drilling location for the Sandborn #05-18H Well, located in Lot 1 of Section 18, Township 5 North, Range 61 West, 6th P.M., for the production of oil, gas and associated hydrocarbons from the Niobrara Formation.
40763305-29-2012  NBRRApproves the request for an order to allow one or more additional horizontal wells within each existing approximate 640-acre drilling and spacing unit, for certain lands in Townships 5 North, Ranges 61 and 62 West, 6th P.M., for the production of oil, gas and associated hydrocarbons from the Niobrara Formation.
40771110-01-2012  NBRRAffirms Order Nos. 407-380 and 407-633 to apply to interested parties which were not provided notice of the initial hearing in these matters for lands in Section 18, Township 5 North, Range 61 West, 6th P.M., and Section 15, Township 5 North, Range 62 West 6th P.M. for the development and operation of the Niobrara Formation.
407206106-12-2017  NBRRApproves Bill Barrett Corporation’s request for an order to among other things: Pool all interests in an approximate 640-acre horizontal wellbore spacing unit, established for the Application Lands, for the development and operation of the Niobrara Formation.
407319312-15-2020  NBRRAmong other things approves an order to pool all interests in three approximate 400-acre designated horizontal wellbore spacing units, one approximate 200-acre designated horizontal wellbore spacing unit, and one approximate 479.64-acre designated horizontal wellbore spacing unit and to subject all nonconsenting interests to the cost recovery provisions of § 34-60-116(7), C.R.S., for the drilling of the State Antelope V41-B11-13HNC Well (API No. 05-123-50289), State Antelope V-B-13HNB Well (API No. 05-123-50288), State Antelope 42-12-13HNC Well (API No. 05-123-50290), State Antelope W42-C12-13HNB Well (API No. 05-123-50293), State Antelope X44-D14-13HNC Well (API No. 05-123-50292), State Antelope Y44-E14-13HNB Well (API No. 05-123-50287), State Antelope Y-E-13HNC Well (API No. 05-123-50291), for the development and operation of the Niobrara Formation.