HEARING DOCKET: June, 2003 prelim
Page 1 4/16/2003
No. Cause Applicant/Attorney or Representative Date
Rec'd
Field
Formation
County
Matter Remarks  
0306-AW-06 489 J-W Operating Company/  William G. Odell 4/11/2003

Buffalo Grass

Niobrara

Yuma

Request for an order to allow up to two (2) additional wells to be drilled in existing 160-acre drilling and spacing units in certain Sections of Township 4 North, Range 47 West, 6th P.M. to be located no closer than 560 feet to the outer boundaries of the units.

Order 489-6

0306-AW-07 351 J-W Operating Company/  William G. Odell 4/11/2003

Rock Creek

Niobrara

Yuma 

Request for an order to allow up to two (2) additional wells to be drilled in existing 160-acre drilling and spacing units  in certain Sections of Township 5 North, Range 46 West, 6th P.M. and Township 5 North, Range 47 West, 6th P.M. to be located no closer than 600 feet to the outer boundaries of the units.

Order 351-4

0306-UP-02 407 Prima Oil & Gas Company/    Peter A. Bjork 4/14/2003

Wattenberg

Codell/Niobrara

Weld

Request for an order to pool all interests within the drilling unit comprised of the E1/2 NW1/4 of Section 2, Township 5 North, Range 67 West, 6th P.M.

Application withdrawn, hearing cancelled

0306-GA-03 1V Staff Recommendation 3/26/2003

Rulison

Wasatch

Garfield

AOC - Request to authorize COGCC staff to make a claim on the Pittenger's No. 1 Well Two Thousand Five Hundred dollar ($2,500) plugging bond and plug and abandon the Pittenger No. 1 Well located in the SE1/4 SE1/4 of Section 13, Township 6 South, Range 94 West, 6th P.M.

Order 1-102

0306-UP-03 112 Petrogulf Corporation/               Paul D. Clarys (Page1, Page2) 4/16/2003

Ignacio Blanco

Fruitland Coal

LaPlata

Request for an order to pool all interests in the 320-acre drilling and spacing unit comprised of the N1/2 of Section 24, Township 35 North, Range 7 West, 6th P.M.and to allow the proposed well, Petrogulf #24-22, to be drilled at an exception location 2510 FNL and 1980 FWL of Section 24.

Application withdrawn, hearing cancelled

0306-UP-04 112 Petrogulf Corporation/               Paul D. Clarys (Page1, Page2) 4/16/2003

Ignacio Blanco

Fruitland Coal

LaPlata

Request for an order to pool all interests in the 320-acre drilling and spacing unit comprised of the N1/2 of Section 23, Township 35 North, Range 7 West, 6th P.M. and to allow the proposed well, Petrogulf #23-32, to be drilled at an exception location 2510 FNL and 1980 FEL of Section 23.

Application withdrawn, hearing cancelled

0306-GA-04 1 Gunnison Energy Corporation/ David R. Little (Page1, Page2, Page3, Page4) 4/18/2003 Delta Request for a variance to extend the time within which Gunnison Energy may commence operations on the Spaulding Peak #1 Well, the Dever Creek #1 Well and the Lone Pine #1 Well from July 3, 2003 until July 3, 2004 and on the Stevens Gluch #1 Well from July 15, 2003 until July 15, 2004. 

Order 1-101

0302-GA-01
1
Evergreen Operating Corp./       Dennis Carlton
12/26/2002

Purgatoire River

Vermejo Coal

 Las Animas

Request for a variance to allow the Kildare 42-20 Well to be located closer than 150 feet from the surface owner's property.

Application withdrawn, hearing cancelled